Neonwork on a 54 metres long facade.The neon tubes are fixed to a relief of stainless steel.
The work is switched on day and night; parts of the work are either controlled by a barometer, a program to shows the right time, a section
is controlled by a computer and a certain part is permanently switched on.
(Sorø Power Station, DK).

Photo: Bent Ryberg